top of page

DCS EXTENSION FOR HONG KONG SCIENCE PARK


The objective is to design the modification of the existing district cooling system and the subsequent connection to

all individual buildings in the science park such that the cooling system operates as an interconnected system. The

extension works involves the DCS extension from the existing phase 2 service tunnel to phase 1 service tunnel area.


@ Shatin

MEP Designer + Project Manager

Completed in 2020



Comments


ISO9001.png

T: +852 3615 8624                             ©Updated 2024 SC Consultants

F: +852 3547 0532

bottom of page