LIGHT PUBLIC HOUSING AT MA ON SHAN & 5 VACANT SCHOOL PREMISES
MEP designer for 1 block of residential building consisting of 852 units by MiC module, and converting the 5 vacant schools into 600 units. Commencement: 2024 Location: Ma On Shan, Kwun Tong, Sheung Shui, Wong Tai Sin Completion: Present Client: Architectural Services Department & Housing Bureau


CHUANG CHUNG WEN CENTRE FOR THE ELDERLY FOR HONG KONG CHRISTIAN MUTUAL IMPROVEMENT SOCIETY (HKCMIS)
To provide a MEP Design consultancy service for renovation works for elderly centre. Commencement: 2023 Location: N/A Completion: 2024 Client: Chinachem Group


ENERGY AUDIT SERVICES FOR CHINACHEM PROPERTIES
To provide REA energy audit Services for the various Chinachem properties. Commencement: 2023 Location: N/A Completion: 2024 Client: Chinachem Group


ENERGY AUDIT SERVICES FOR ISS PROPERTIES
To provide REA energy audit Services for the various ISS properties. Commencement: 2019 Location: N/A Completion: 2025 Client: ISS


REA CONSULTANCY SERVICE FOR HAS OFFICE AT AWTC 103-109
To provide REA Consultancy Service for HAS office at AWTC 102-109 with a net usable area larger than 5,000ft2 Commencement: 2019 Location: Check Lap Kok, Hong Kong Completion: 2019 Client: Hong Kong Airport Services Ltd


REA CONSULTANCY FOR AT IFC 2
To provide a REA consultancy for Form of Compliance in lighting for the HONY Capital at Unit 06-11, 70/F, IFC 2. This Project with lighting design and lighting control vendor. Commencement: 2020 Location: Central, Hong Kong Completion: 2020 Client: Hony Capital


FIRE SERVICES UPGRADE FOR PLK LI SHUI CHUNG MEMORIAL HABITATION CENTRE
To investigate and upgrade the fire services design to fulfil the latest FSD COP with the subversion of Social Welfare Department. Commencement: 2018 Location: Tai Wai, New Territories Completion: 2019 Client: Social Welfare Department


RENOVATION OF JOCKEY’S ROOM AT SHA TIN RACECOURSE FOR THE HONG KONG JOCKEY CLUB
MEP consultancy for renovation for the Jockey’s Rooms at the 1/F and 1M/F of Racing Centre, EDR Office in the Grandstand I of Shatin Racecourse. Upgrade of electrical power supply and modification of existing switchboard to suit the new renovation. Commencement: 2024 Location: Shatin, New Territories Completion: present Client: The Hong Kong Jockey Club


ANFIELD ST. BOSCO KOON YING SCHOOL
BS consultant for the design of this school at Mai Po San Tsuen, Yuen Long. There are 4 buildings are included with approximate site area 1,130m2. Providing a new page to the abandoned school and revitalizing its significance, the new soak-away system includes an underground septic tank, and a soak-away pit to cater to the increased discharging capacity. Commencement: 2021 Location: Mai Po, New Territories Completion: 2023 Client: Anfield School


YAN OI TONG SERVICE CENTRE FOR CAREER PLANNING AND ENTREPRENEURSHIP
BS consultant for the design of this career planning and entrepreneurship. The total GFA is around 2,350m2. The area involved is classroom, cookery room, hotel room attendant training room, beauty salon training room, pet grooming room, computer room, job referral zone & reception, counselling room, store room, start-up supporting zone, multi-function & experiencing zone, health care room, creative media zone, sharing space, exhibition & recruitment zone, TSPD office, female


FARMING AND FISHERY EDUCATION CENTRE
BS consultant for the design of this educational Centre. The total GFA is around 20,300m2. In a rural lot, power shall be supplied by H-pole, further coordination is required. The Centre is integrated with sustainable elements and fully utilizes natural resources such as a pond water recycling system and solar-powered outdoor lights. Commencement: 2021 Location: Tin Shui Wai Completion: 2023 Client: Tin Shui Wai Community Development Network


HUNG HOM URBAN PARK PHASE I
BS consultant for the design of the open space, guard booth, store, and main utility lead-in at Hung Hom Waterfront. Commencement: 2022 Location: Hung Hom, Kowloon Completion: 2024 Client: Civil Engineering and Development Department


REVIEW OF EMO FOR HONG KONG SCIENCE AND TECHNOLOGY PARK
Engineer tasked to perform technical and economic analysis on the energy management opportunities for Hong Kong Science Park. A comprehensive report detailing the engineering and financial considerations was delivered. Commencement: 2018 Location: Hong Kong Science and Technology Park Completion: 2018 Client: Hong Kong Science and Technology Park


CAMPUS REDEVELOPMENT PLAN, HONG KONG UNIVERSITY OF SCIENCE AND TECHNOLOGY
A holistic review of the HKUST campus, including their existing operating conditions, installed E&M systems capacity, energy usage, EUI, etc.; complete with a feasibility study. Main deliverables is a redevelopment plan based on various tiers of campus improvement. Energy efficiency, future expansion capacity, and maintainability were all considered. Commencement: 2022 Location: Hong Kong University of Science and Technology Completion: 2023 Client: Hong Kong University of Sc


ACCESSIBILITY IMPROVEMENT WORKS AND PROVISION OF SPORTS FACILITIES AT CUHK SHAW COLLEGE
MEP consultant to help providing services to the new lift tower with some spatial rearrangement, and an associated work of relocating the existing cooling towers for new sports facilities. Commencement: 2023 Location: Shatin, New Territories Completion: Present Client: The Chinese University of Hong Kong


MIC HOUSING DEVELOPMENT AT YEN CHOW STREET – PHASE 2
MEP designer for the MiC housing project for 1 no. of 4-storey residential modular housing block. The total nos. of MiC flats are 76 units. Commencement: 2020 Location: Sham Shui Po, Kowloon Completion: 2023 Client: The Hong Kong Council of Social Service


MIC HOUSING DEVELOPMENT AT SHUEN WAN
MEP designer for the MiC housing project for 1 no. of 4-storey residential modular housing block. The total nos. of MiC flats are 276 units. Commencement: 2023 Location: Tai Po, New Territories Completion: 2024 Client: SideBySide


PD DESIGN FOR LAI WAN MARKET
P&D designer for the MiC and the overall ourhaul design for the Lai Wan Market Commencement: 2023 Location: Mei Foo, Kowloon Completion: 2024 Client: Architectural Services Department


HANG SENG TOWER CHILLER REPLACEMENT
MEP consultant to conduct site feasibility study and chiller replacement at Hang Seng Tower. Commencement: 2024 Location: Kowloon Bay, Kowloon Completion: 2025 Client: MTR


FEASIBILITY STUDY FOR TELFORD PLAZA
MEP consultant to conduct site survey and feasibility studies on the status of the existing MEP systems. The study shall steer towards upgrade plans that suit the Client’s commercial expansion goals and deliver a phased upgrading plan to the live building. Commencement: 2023 Location: Kowloon Bay, Kowloon Completion: 2024 Client: MTR


HKREP EDUCATION HUB, GRADE 2 HISTORICAL BUILDING CONVERSION
MEP designer for the adaptive use of Grade 2 historic building into a new performing arts education center. Green Building Award 2021 - Merit Award Commencement: 2020 Location: Jordan, Kowloon Completion: 2023 Client: Hong Kong Repertory Theatre


KADOORIE FARM & BOTANIC GARDENS
MEP consultant for the canteen renovation project. The works involved application to CLP for new electric meter and a comprehensive BS overhaul of the existing canteen. The project included sustainable design elements and was focused on low energy use. BEAM PLUS Interiors v2.0 - Platinum Commencement: 2023 Location: Tai Po, New Territories Completion: 2024 Client: Kadoorie Farm & Botanic Garden


MIC HOUSING DEVELOPMENT AT SHEUNG ON STREET
MEP designer for the MiC housing project for 1 no. of 4-storey residential modular housing block. The total nos. of MiC flats are 103 units. Hong Kong Chapter – AIA Merit Award Hong Kong Chapter – AIA Sustainable Design Award World Design Awards – WDA Merit Award Commencement: 2022 Location: Chai Wan Completion: 2024 Client: Society for Community Organization


HYSAN PLACE & LEE GARDENS
MEP consultancy services for rejuvenation for the streetscape around the Hysan Place & Lee Gardens. HKILA Award 2024 – Merit Award Commencement: 2024 Location: Hysan Place & Lee Gardens Completion: 2025 Client: Hysan Place at Lee Gardens