top of page



HEIDRICK & STRUGGLES HONG KONG
To provide a MEP Design consultancy service for an office renovation works includes open office, reception, storage, meeting rooms, conference rooms, pantries and utility area. This Project with an area ~6,970 sq.ft which located at Level 30 at One Pacific Place, 88 Queensway, Admiralty, Hong Kong. Commencement: 2019 Location: Admiralty Completion: 2020 Client: Heidrick & Struggles


CONTEMPO PLACE, EX. BUILDING CONVERSION
To review the MEP design for the industrial to commercial building conversion project. Commencement: 2018 Location: Kwun Tong Completion: 2020 Client: Contempo Place


BIRD&BIRD HONG KONG
A 2 floors fitting-out project for a law firm. Our services include MEP design for the office which follows a luxury hotel standard, complete with executive bathrooms, water features, state of the art IT systems and a garden. Commencement: 2019 Location: Wanchai Completion: 2020 Client: Bird & Bird


QUZHOU SPORTS PARK PLANNING AND DESIGN, QUZHOU PRC
This massive sustainable sport PARK is comprised of a 30,000-seating capacity stadium, 3,000 seating capacity natatorium,10,000 seating capacity gymnasium, complete with training centre and others leisure facilities. The most prominent facility of the sports centre is a 30,000m2 geothermal lake in the middle of the development which serves as a heat sink and a sustainable heat source for the HVAC systems as well as an aesthetic feature. CFD analysis were conducted to access t


SHIMAO OFFICE, THE CENTRE
Responsible for the E&M calculations and design. High end office design with commercial grade kitchen and pantry. Fitting out project for the New owners of The Centre, in Central with around 16,000 sq.ft. area Commencement: 2018 Location: Central Completion: 2018 Client: Shimao Group Holdings Limited


BOSE HONG KONG
Fitting-out project for a high-quality Audio brand at LEE Garden 1 with 8,767sq.ft area. Responsible for MEP design and project coordination. Also in-charge for BEC submission Commencement: 2018 Location: Causeway Bay Completion: 2019 Client: Bose


FITTING OUT WORKS FOR HONG KONG MORTGAGE COMPANY, HONG KONG
Responsible for the E&M calculation and design works. For the expansion of existing around 3000 sq.ft. office. Commencement: 2019 Location: Cheung Sha Wan Road, Hong Kong Completion: 2019 Client: Hong Kong Mortgage Company


DAVIDSON KEMPNER ASIA
A fitting-out project for a financial company at Central LHT Tower with total area around 5,000sq.ft. From half of the floor expanding to whole floor which needs phasing to be well-coordinated. Responsible for being the MEP designer and project coordinator. Commencement: 2018 Location: Central Completion: 2019 Client: Davidson Kempner Capital Management L.P


NURSING LABS AT HONG KONG BAPTIST UNIVERSITY
To provide MEP design services for HKBU on the A&A and fitting out works for converting existing classrooms into educational nursing laboratories. Commencement: 2018 Location: Kowloon Tong Completion: 2020 Client: The Baptist University of Hong Kong


TOILET RENOVATION FOR INFINITUS PLAZA
Commercial To improve MEP design for toilets at all office Levels to correct the current issues of poor air balancing and unpleasant odor. The project will undergo phased construction to suit operation needs. Commencement: 2019 Location: Sheung Wan Completion: 2022 Client: Lee Kam Kee


ELECTRIC POWER DESIGN FOR TENCENT SHANGHAI
To provide electrical power design for a new high-rise building’s façade lighting with control and cable containment. Full tender package to be issued in bi-lingual. Commencement: 2023 Location: Shanghai, PRC Completion: 2024 Client: Tencent


BUILDING SERVICES SPECIFICATIONS AND LEED ACCREDITATION OF ECLAT SERVICES APARTMENT AT HUIZHOU, PRC
The objective of assignment is to compile building services specifications for the development and to obtain LEED Gold rating. We offered qualified LEED professional consultation to the client and attended coordination meetings with the contractors to guide them towards achieving the targeted Gold accreditation requirements. The development consists of two 16 level service apartment blocks each with two levels of basement, grossing a floor area of 68800 m². Commencement


PENINSULA HOTEL BACK OFFICE
Be responsible as the building services engineer for the fit-out works of the office on MVAC, electrical, fire services, plumbing and drainage systems with sustainability design and Fire Services system need to stich with the building version. The net area ~5,000 sq.ft. Commencement: 2020 Location: Tsim Sha Tsui Completion: 2020 Client: The Peninsula Hotels


MEP REPLACEMENT WORKS AT CONRAD HOTEL, HONG KONG
To provide an Electrical consultancy service for replacing the dated MCB equipment, chilled water pipe insulation, and hot water pipe insulation at Conrad Hotel Hong Kong Commencement: 2020 Location: Admiralty Completion: 2022 Client: Conrad Hotel


MIC HOUSING DEVELOPMENT AT YEN CHOW STREET - PHASE 1
MEP designer for the modular integrated housing project at Yen Chow Street. This residential development aims to provide affordable housing relief for those who are queued for public rental housing and/or currently live in regrettable housing conditions. Commencement: 2020 Location: Sham Shui Po Completion: 2022 Client: The Hong Kong Council of Social Service
bottom of page
