top of page



CENTRE FOR PERCEPTUAL AND INTERACTIVE INTELLIGENCE
MEP Consultancy Commencement: 2020 Location: Hong Kong Science Park Completion: 2021 Client: Centre for Perceptual and Interactive Intelligence


MICROBIOTA I-CENTER
MEP Consultancy Commencement: 2020 Location: Hong Kong Science Park Completion: 2021 Client: Hong Kong Science Park


MULTI-SCALE MEDICAL ROBOTICS CENTER
Commencement: 2020 Location: Hong Kong Science Park Completion: 2021 Client: Multi-scale Medical Robotics Center


HONG KONG CENTRE FOR LOGISTICS ROBOTICS
MEP Consultancy Commencement: 2020 Location: Hong Kong Science Park Completion: 2021 Client: Hong Kong Science Park


CENTRE OF NOVOSTICS
MEP Consultancy Commencement: 2020 Location: Hong Kong Science Park Completion: 2021 Client: Hong Kong Science Park


TOILET RENOVATION ATPRINCE PHILIP DENTAL HOSPITAL
To provide an MEP consultancy for design works for the toilets at 6/F of Prince Philip Dental Hospital (PPDH). Commencement: 2021 Location: Sheung Wan Completion: 2021 Client: Prince Philip Dental Hospital


MIC HOUSING DEVELOPMENT AT YING WA STREET
MEP designer for the MiC housing project for 2 nos. of residential modular housing blocks. The nos. of MiC flats are 140 units. Green Building Award 2023 - Merit Award Green Building Award 2023 - Special Citation on United Nations Sustainable Development Goals HKIA 2022 Merit Award of Hong Kong - Residential Building HKIA 2022 Special Award - Technology or Innovative Architecture HKIA Special Award 2022 Finalist - Human & Social Inclusion Commencement: 2020 Location: Nam Cheo


TRADEPORT HONG KONG CHILLER REPLACEMENT
SCC is the BS Consultant for a 1000kW screw type Air-cooled Chiller replacement project. The equipment was selected to suit latest Building Energy Code Requirement as well as the CLP Eco Funding requirements. SCC assisted the Client to successfully apply for CLP Eco Funding to improve the COP of the Chillers and offered economic and effective solution. Commencement: 2019 Location: Chek Lap Kok Completion: 2020 Client: Tradeport Hong Kong Limited


InnoHK LABORATORY SPACES AT HONG KONG SCIENCE PARK
MEP consultant for the laboratory spaces in various buildings at Hong Kong Science Park. These laboratories range from teaching, research & development, and commercial activities. The laboratory facility includes both wet and dry labs with a Biosafety level 2 rating. Commencement: 2019 Location: Hong Kong Science Park Completion: 2019 Client: The Chinese University of Hong Kong


GOSHAWK, HONG KONG
Responsible for MEP design services for a design-and-built fitting-out project. Our services include design of the air-conditioning system, electrical supply (need further power upgrade) and distribution system, fire Services installation and plumbing and drainage for the wet pantry. Commencement: 2019 Location: Central Completion: 2019 Client: Goshawk


SHIMAO RESIDENTIAL SHOWROOM AT THE CENTER, HONG KONG
Be responsible as the building services engineer for the whole floor net area ~20,000 sq.ft. at The Center, Central. To provide special design on HVAC to cater additional Cooling load and fresh air, where 4 AHU has been provide instead of original underfloor supply system. And according to the showroom partition and design the ceiling system for FS, HVAC and Elec point. Commencement: 2020 Location: Central Completion: 2020 Client: Shimao Group Holdings Limited


ARTS EDUCATION CENTRE DEVELOPMENT FOR HISTORIC BUILDING
MEP designer for the adaptive use of Grade 2 historic building for a new performing arts education center. Commencement: 2020 Location: Jordan Completion: 2020 Client: HK Repertory Theatre


BEAM PLUS SERVICES HALFWAY HOUSE FOR BAPTIST OI KWAN SOCIAL SERVICE BOKSS
Project Manager for HKSTP project. The project is to perform the design of the DCS extension as well as performing technical analysis on the historical operation of the chiller plants in Hong Kong Science Park. The project consists of designing an underground trench to facilitate the extension of main chilled water pipes, which is capped off for the future expansion of the district cooling system. Commencement: 2019 Location: Kwun Tong Completion: 2019 Client: Non-gover


DCS EXTENSION FOR HONG KONG SCIENCE PARK
The objective is to design the modification of the existing district cooling system and the subsequent connection to all individual buildings in the science park such that the cooling system operates as an interconnected system. The extension works involves the DCS extension from the existing phase 2 service tunnel to phase 1 service tunnel area. Commencement: 2018 Location: Hong Kong Science Park Completion: 2020 Client: Hong Kong Science Park


ICE SERVICES FOR COMBINED CYCLE GAS TURBINE FOR CLP
SCC was responsible for an overseas review and inspection of the factory test for the 6.6kV switchboards used by CLP's combined cycle gas turbine. Our professional engineers offered independent verification on the equipment's calibration and inspected a series of electrical tests. Commencement: 2017 Location: Tuen Mun, Hong Kong Completion: 2018 Client: CLP Power Hong Kong Ltd


MEP CONSULTANCY SERVICE FOR NGO C&A HOME
Provide MEP Consultancy Services for a nongovernment organization. Care and Attention Home for the Elderly. Commencement: 2018 Location: Shatin Completion: 2019 Client: NGO


HOSPITAL AUTHORITY’S CORPORATE DATA CENTRE 7 POWER MANAGEMENT REPLACEMENT, HONG KONG
Responsible for review, coordination and inspection of the replacement works and verified that the works sequence has no safety hazards or power degradation. Our professional engineers offered on site monitoring of the replacement works and the project was completed in a timely matter. Commencement: 2017 Location: Kwai Chung, Hong Kong Completion: 2017 Client: Hospital Authority


MEP CONSULTANCY FOR 88 PLAZA RESTAURANT
To provide MEP Design consultancy service for Restaurant at Yeung Uk Road, Tsuen Wan with an approximate area of 9,000sq.ft. Commencement: 2019 Location: Central, Hong Kong Completion: 2020 Client: Goshawk Management Limited


HKSKH LADY MACLEHOSE CENTRE, KWAI TSING
Be responsible as the project supervisor for the fitting-out project at Kwai Wah Building. Our services include design of all MEP services and BEC submission. To provide a safe and green elderly Centre, BEAM Plus Interior – Silver rating is targeted. Commencement: 2019 Location: Kwai Hing, New Territories Completion: 2021 Client: Hong Kong Sheng Kung Hui


RENOVATION WORKS OF LA HACIENDA 27-33 KELLETT MOUNT ROAD
Provide Design Services for renovation of a prestigious residential development at Kellett Mount Road. Electrical works will be the major part of the project. Careful engineering design on minimizing the impact of the electrical system switch over is the main challenge of this project. Commencement: 2018 Location: The peak, Hong Kong Completion: 2018 Client: La Hacienda


MEP AND SUSTAINABLE DESIGN OF PARKVIEW GREEN DEVELOPMENT ATNEW JIANGWAN, SHANGHAI, PRC
The objective is to carry out an all-encompassing sustainable MEP design by incorporating passive design elements to improve the comfort level of its occupants whilst minimizing the use of mechanical equipment. CFD simulations were conducted to investigate the natural ventilation performance of the proposed design including biosphere funnels under a 70m high canopy, covering a development of 3 low-rise office blocks and a luxury hotel, complete with a retail complex at the lo


GMP CELL THERAPEUTIC LAB AT THE HONG KONG INSTITUTE OF BIOTECHNOLOGY
MEP Consultant for the Advanced Therapeutic Products lab in Hong Kong, the facility is first of its kind in Hong Kong. The facility is designed to create pressurized laboratories that are compliant to the international GMP standards of class 2. Commencement: 2021 Location: The Chinese University of Hong Kong Completion: 2021 Client: The Hong Kong Institute of Biotechnology


AVOLON HONG KONG
Be responsible as the project supervisor for the fitting-out project at The Center. Our services include design of all MEP services and BEC submission. With a feature of Underfloor HVAC system as the based building system, the cooling load calculation has different as traditional HVAC system to provide energy effectiveness. Commencement: 2019 Location: Central Completion: 2020 Client: Avolon


BLACKSTONE HONG KONG
A two stories fitting-out project for a multinational investment management firm located at IFC 2, Central, with total floor area around 20,000 ft2. Our services include MEP design and REA consultancy for the office. The two floors of this office is joined by an internal staircase. Commencement: 2019 Location: Central Completion: 2020 Client: Blackstone
bottom of page
