AVOLON HONG KONG
- SCC
- Mar 4, 2021
- 1 min read
Updated: Aug 1, 2022
Be responsible as the project supervisor for the fitting-out project at The Center. Our services include design of all MEP services and BEC submission. With a feature of Underfloor HVAC system as the based building system, the cooling load calculation has different as traditional HVAC system to provide energy effectiveness.
@ Central
5,400 sqft
MEP Designer
Completed in 2020
Comentários